|

|
- API 6A/ 17D (ISO 10423/ ISO 13628-4) PR2, Annex F tested
- Extended FMC endurance tested at 300oF
- Independent Cv test to ISA 75.02
- Independent erosion test
- Independent API 6A Annex I slurry test
- Hyperbaric test to 10,000 ft (3,048 m) water depth
- Endurance tested at 1M pulses/steps
- Subsea field tested under severe operating conditions
|
|

|
Features a multi-hole tungsten carbide plug and cage design with a steel protective jacket to prevent impact damage.
The plug is fully guided, pressure balanced and rigidly attached to the stem to eliminate flow induced vibration.
- Large gallery to mitigate erosion and extend choke life
- Fully supported cage is capable of reverse flow at maximum working pressure
- Body outlet designed for complete wear protection
|
|
|
Features a FMC field proven "KL" two piece hinged clamp connector with a horizontal Class IV ROV interface.
- Funnel type guide structure to interface with choke running tool with ROV grab bar and electrical parking receptacle
- Choke body with two stab type wet-mate hydraulic connectors
- Hot stab test port between primary and secondary body to insert seals
- Multi-hole tungsten carbide plug and cage insert with steel protective jacket to prevent debris impact damage
|
 |
Provides easy retrieval and deployment on a down line with ROV assistance, no running tool is required.
- Improved reliability and availability with simplified interfaces
- Small compact footprint allows for straightforward subsea retrieval and deployment
- Increased visibility for guidance and connection
- Choke insert and body are recovered as an assembly, ideal for high erosion service
- Utilizes a cost effective bolted bonnet design
- Improved thermal performance due to simplified interface and ease of adding insulation onto entire choke body and actuator
- Upgradeable by adding retrievable flow meters and sensors
- Reconfiguration is contained in the flow module permitting standardization of core tree components
- Sensitive components can be retrieved and deployed without performing major workovers
- Allows for easy conversion from production tree to water injection service and vice versa
|
|
Designed as a "fail as is" with a Class IV ROV manual override, the actuator provides remote position feedback via a direct stem mounted LVDT.
- Two double acting spring return pistons
- Crossover tubing to guarantee operation in all hydraulic "back pressure" conditions
- No net actuator housing volume change during the "stepping" mode
- Large top mounted visual indicator
- Compensation viai an enclosed diaphraghm
|
|
 |
The tool is wireline deployed with ROV assistance for insert retrival and deployment.
- Three passive pistons provide soft landing
- Latching and unlatching the tool is purely mechanical
- Tool completely extends to protect the choke insert on retrieval and deployment
- Running tool provides a 45o rough alignment capture angle
- Hydraulic hot stab provided to assist in choke insert removel
|