Statoil Yttergryta

Norway_StatoilHydroYttergryta

Norway Midgard 6507/11

Landmark: Subsea structure built and installed before drilling of exploration well

The ISS was installed in January 2007.The flow base and PLEM were scheduled to be installed June 2008, the tie-in in August 2008 and the completion was scheduled for October 2008. Start-up was set for January 2009. Yttergryta is tied-in to Midgard X on the Aasgard field.

  • Contract Award: 2007
  • Sales Location: Kongsberg, Norway
  • Fabrication Trees: Dunfermline, U.K.
  • Fabrication Controls: Kongsberg, Norway 
  • Service Base: Åsgard Drift, Stjørdal, Norway
  • Host Type: Platform
  • Contract Type: EPC