Technologies
Subsea Services
Projects
Africa
Asia-Pacific
Australia
Europe
North America
South America
Contact Us

Talisman U.K. Frame Agreement

Europe_TalismanUkFrame

U.K. Blocks, including TNT, RP12, Orion TOR, TSI, TWI, TNP, Orion May, Burghley, Duart North

Landmark: U.K. frame agreement

Talisman uses FMC’s Maximum-function Enhanced Horizontal Subsea Tree (EHXT) to provide flexibility to install FMC trees in any field to be developed. The tree design accommodates minor module changes to be a producer or producer with gas lift or a water injector. It is provided with a direct hydraulic control systems interface as well as a large area to accommodate the mounting of any vendor’s Subsea Control Modules should a multiplex control system be required. This design flexibility tree functionality and controls type  makes the EHXT the tree of choice of either brown field or new green field developments.  

  • Contract Award: 2004
  • Sales: Aberdeen, U.K. 
  • Fabrication: Dunfermline, U.K.
  • Service Base: Aberdeen, U.K.
  • Host Type: Various Platforms
  • Contract Type: Frame Agreement